Aduan 投诉专区
网上投诉表格
OnLine ComplainForm
e-Aduan

务边国会选区
Parliment Gopeng

新邦波赖州选区
DUN Simpang Pulai

迪遮州选区
DUN Teja

E-Mail Us 电邮我们

党资料
州联委会
最高理事会
人民公正党章程
入党表格 Borang Keahlian
活动通告
《15 Malaysia》短片观赏会
日期:2009年9月30日(星期三) 晚上8点
地点:松俊花园服务中心(观音洞对面)
分享人:YB Dr Lee

中秋月光晚会
日期:2009年10月1日(星期四) 晚上7点
地点:新咖啡山佛爷庙

中秋月光园游会
日期:2009年10月3日(星期六) 晚上8点
地点:昆仑喇叭福德祠停车场

下载区 Downloads
Borang Dermasiswa

Borang Pembaharuan Penangguhan Khimat Negara

Borang Penangguhan Khimat Negara

Borang Pengecualian Khimat Negara

Borang Rayuan Penangguhan Khimat Negara

Other things


Boon Chye: Bakun Project a RM 7.3 billion blunder, and more to come
Sabtu, 26 Jun 2010


(25 Jun, Ipoh) Dr Lee Boon Chye, Vice President of Parti Keadilan Rakyat expressed shock that RM 7.3 billion has been spent on the Bakun Hydroelectricity Project with no clear decision on the demand for the electricity generated.

In the answer given by the Minister of Finance to questions raised regarding the Bakun Hydroelectricity Project, the Minister of Finance in the written reply stated that the amount spent for Bakun Project was RM 7.3 billion as of May 2010. The minister stated further that the 2400 Megawatt electricity generated by the hydroelectricity when fully operational March 2012, will be used for smelting plant as well as to support Sarawak Corridor Renewable Energy (SCORE) in Sarawak. It seems the planned undersea cable to channel the electricity to West Malaysia, as originally planned, was scrapped.

Dr Lee, who is also the Member of Parliament for Gopeng expressed that the Bakun project was a major blunder due to poor planning. It was carried out merely to serve the interest of selected few, including parties involved in biomass clearance of the area (to extract billion ringgit worth of timber) and conglomerates such as Cahaya Mata Sarawak Berhad who will set up aluminum smelting plant using cheaper-than-market electricity from Bakun.
The Bakun project which was revived in 2000, after 2 failed attempts before, was targeted for completion by September 2007, but has since delayed until March 2012. It was carried out at great expense. Besides the financial burden, Bakun Project also caused forest covering the size of Singapore to be flooded and 10,000 indigenous people to loss their homes and be relocated.

Since the current energy requirement for whole of Sarawak is only 1500 Megawatt, the extra 2400 Megawatt from Bakun will have nowhere to go, unless there is existing industry which will consume the excess electricity generated. Even though there were repeated announcements of aluminum smelting plant, a pulp and paper plant and even the world’s biggest steel plant, all these projects remain on paper, without information on the economic viability and environmental impact. For example, the most contentious issue for the panned aluminum smelting plant by Cahaya Mata Sarawak Berhad was the electricity tariff, which will determine the economic viability of the smelting plant. Where will the electricity go if none of these projects materialize?

Hence according to Dr Lee, the RM 7.3 billion spent so far for an economically ill-conceived, socially disruptive and environmentally disastrous Bakun Hydroelectricity Project is scandalous. The same amount of money would have been more than enough to power all the long houses and remote settlements in Sarawak. With the amount of money, 100% coverage for electricity supply for whole of Sarawak will become reality, instead of current 72.6% where many areas in Sarawak still cannot get electricity supply.
posted by PKR - Ranting Gunung Rapat 人民公正党昆仑喇叭支部 @ 01:32  
0 Comments:

Catat Ulasan

<< Home
 
free counters

690A Tingkat 1 , Jalan Besar Gunung Rapat , 31350 Ipoh, Perak
昆仑喇叭重要事记
全马首个民选村长的新村
新书推介
『晴天霹雳』
霹雳州夺权事件演变


每本RM15(不包括邮寄费用)
附送作者YB曾敏凯州议员
亲笔签名
Previous Post
Archives
务边区 Links
Pakatan Rakyat Links
Alternative Media Links
Powered by

© 2009 PKR - Ranting Gunung Rapat Cabang Gopeng 人民公正党务边区昆仑喇叭支部 .
Blogger Templates
by eRic Lim and Powered By AV Computer Sales & Service